The Innovation and Wellness Centre will be home to a range of engineering facilities, including labs, teaching studios, and a common room.
Engineering and Applied Science students will be spending a lot of time in the Innovation and Wellness Centre (IWC) when it opens next academic year. The new facility will bring together several mechanical and materials engineering program areas on campus into one new and modern space. It will also add new resources for undergraduate engineering students.
“This leading-edge facility will uniquely bring together innovative undergraduate teaching facilities, world-leading research facilities, and innovation programming in one space,” says Kevin Deluzio, Dean of the Faculty of Engineering and Applied Science. “New undergraduate teaching and design studios, interdisciplinary research clusters, and flexible innovation space within the IWC will bring together professors, undergraduate, and graduate students in a way that builds community and fosters new ideas.”
The engineering facilities will be located on the second and third floors of the IWC. The second floor will feature an interdisciplinary mechatronics laboratory where mechanical and electrical engineers will be able to work together, an undergraduate common room, a rapid prototyping lab, and three engineering teaching studios. Rather than individual seating, the studios emphasize collaboration by grouping students in tables of four to eight. Each studio will accommodate about 80 students, and the walls can be moved to create one large studio.
On the third floor, you will find the IWC’s research labs. The Beaty Water Research Centre will include four wet labs, where chemical and civil engineering students and faculty will handle hazardous materials and conduct research. The facility will bring together water researchers from across the university, supporting 40 graduate students and 12 faculty members.
The third floor will also include brand new labs dedicated to studying human-machine collaboration. A dozen faculty members will be based out of this space, along with up to 40 graduate students. The Faculty of Engineering and Applied Science is currently recruiting five new academics specializing in disciplines such as machine learning, data mining, and smart prosthetics, aligning with the Principal’s faculty renewal plans.
“This focus on human-machine collaboration will provide an opportunity for Queen’s Engineering and Applied Science to lead the country in this increasingly important field,” says Brian Surgenor, a professor in the Mechanical and Materials Engineering department who is helping to coordinate the design of the IWC’s engineering space. “Coupled with the renovated spaces for our undergraduate students, the IWC will provide a significant enhancement to the student experience and our Faculty’s research leadership.”
The was made possible through $55 million in philanthropic support, with a significant portion donated by Queen’s engineering alumni. In addition, the federal and Ontario governments contributed a combined total of nearly $22 million to this facility.
To learn more about the Innovation and Wellness Centre, . The centre is scheduled to open in Fall 2018.
This story originally appeared in the